We will be reducing the releases from Vallecito Reservoir on Sunday evening, Nov 29th , from 600 cubic feet per second (cfs) down to 400 cfs.

This reduction will give the utilities in the Ignacio area a chance to see if repairs near the river channel can be done with a 400 cfs release. If that flow is still too high, then we may go to a 200 cfs release on Monday night and see what the impacts are for those repairs.

Once a flow regiment is determined, the release will go back closer to 500 cfs by Tuesday evening, Dec 1st . That release should be maintained until the utilities can stage all the equipment for final repairs. Hopefully construction will be starting the week of December 7th .

The reduction in releases from Vallecito is also helping Navajo Reservoir manage their reservoir elevation and assisting in the monitoring of repairs and conditions below that reservoir.